This process is the application of a particular weight load of chosen materials to measure the change in soil conditions. Engineers use this technique to help property owners and construction teams prepare or test a site with soft soil for development. This technique can predict the types of materials and soil stabilization techniques necessary for installing a fill pad.
Usually, the engineering team will test the soil, conduct studies to determine the extent of the uneven or soft ground, and apply massive loads to the ground to measure the shifting and sinking that occurs. Then, the team can create a fill pad design that meets or exceeds the needs of the project proposal.
Reasons Engineers Use Surcharging
These areas are engineered soil packs or compacted materials helpful in creating a stable surface for construction. They may use natural or synthetic materials. For example, fill pads are effective for highway builds, home construction, shoring up retaining walls and fixing existing structures. Engineers use the testing results from surcharging or preloading to determine what materials best address the project's issues.
How Surcharging Helps Engineers Understand Trenches
Adding a vertical weight using fill materials next to the ground opening allows engineering teams to monitor and measure ground movement. They use the results to identify problems in underground construction. The information also helps them determine whether a trench is safe for workers to use.
If the team discovers problems, the group can meet with construction crews and architects to figure out how to stabilize the trench. They may use various techniques to shore up the opening, including compacted fill pads, injecting soil stabilizing materials, and pinning. Changing the slope or angle of the soil is another way the team can address the problem. Sometimes, reforming the trench is an acceptable way to stabilize the ground ahead of construction.
Building on Fill Pads
Once the engineering team decides how much weight the ground can handle with proper stabilizing methods, then construction can begin. Building will involve constant monitoring and regular reporting to ensure a safe and effective work environment. Crews may notice laser tracking equipment that measures ground or building movement. If adjacent structures are present, then monitoring these buildings is necessary. Work continues as long as any movement is within acceptable parameters.
How Engineers Adjust Surcharge Loads to Meet Site Conditions
When a load puts too much weight on a foundation, trench, highway, or ground system, there are two ways the engineering team can adjust the fill to decrease the effects. One method is to take out some of the material to cut back the weight load. Another way to mitigate excess loads is to spread the fill out and extend it further than the original parameters.
Engineers must figure in the load of construction equipment traveling over the area and any materials that are on site. Regular monitoring helps protect workers and ensure the ground remains even. Ground tracking technologies ensure the earth is stable for construction and final project designs.
Any construction team needing to excavate should consult an engineer to ensure the soil is stable and can withstand project needs like trench digging and foundation shoring. Property owners who know the ground is not suitable or stable enough for building need the help of engineers to determine if the land is capable of accepting a fill pad. Builders planning to develop uneven areas with sloping ground should contact an engineering team to find out if there is a permissible way to shore up the sloping ground or even out the area.
Choose Kagaoan Engineering Fill Pad Design Consultants for All Surcharge and Fill Pad Design Needs
Our team dedicates our resources to help clients stay on budget, within timelines, and in regulation. We can help with permits, assessing properties, collecting data, testing soil, and measuring weight limits for surcharge and fill operations. Our team has decades of combined experience and the skills that allow us to offer exceptional quality and service. Our reputation as a leader provides us the opportunity to work on many projects in the Tri-State area. With top reviews, local business contacts, and a deep understanding of the local permitting requirements, our team is available to help builders and construction firms meet project needs.
To find out about our surcharge fees, contact our fill pad design consulting team at 516-208-1533. Our team is happy to set up a consultation in NY and surrounding areas like the five Burroughs.